    60kVA Auto change-over panel

    I am looking for a ball-park figure for the cost of the above panel without controller. Thanks
  • dfsa
    Bronze Member

    • Jun 2012
    • 166

    #2
    Originally posted by Sparks
    I am looking for a ball-park figure for the cost of the above panel without controller. Thanks
    Hi Sparks, you need to supply the make of the controller you plan to incorporate. The panel need to have termination points where you can connect into. The configuration on the switch gear need to be around the capability of the controller.

    Comment

    • dfsa
      Bronze Member

      • Jun 2012
      • 166

      #3
      Originally posted by Sparks
      I am looking for a ball-park figure for the cost of the above panel without controller. Thanks
      Sorry forgot to ask: What do you switch over. Transformers, standby, or gen set.

      What type of loads do you run. Inductive, resistive, or both.

      Comment

      • Sparks
        Gold Member

        • Dec 2009
        • 909

        #4
        Thank you for your response dfs. I have been too busy to get here in a while. Managed to find the missing panel by the importers.