Please could someone explain what needs to be filled in on the CoC form in order to CoC a changeover switch?
A standby generator has been wired into a changeover switch to switch between mains and generator in the event of a power failure.
What readings do i have to put on the form in order to satisfy the CoC?
Thanks a lot
Simon
A standby generator has been wired into a changeover switch to switch between mains and generator in the event of a power failure.
What readings do i have to put on the form in order to satisfy the CoC?
Thanks a lot
Simon